KAR 4.26% $1.46 karoon energy ltd

Ann: Peru Drilling Update, page-7

  1. 2,936 Posts.
    lightbulb Created with Sketch. 277
    Water depth is 350 metres, planned total depth of the well is 3026 metres and drilling time is estimated at 4 to 6 weeks.

    ANZ
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.