Same production method but the fundamental difference is in the geology. Linc energies field in the Surat basin in Qld posed direct threat of contamination to ground water connected to rivers/humans/agriculture etc, whereas Leigh CK's field is in a sub basin where the ground water is stagnant and does not flow to surrounding water ways. Refer to early announcements by the company regarding ground water monitoring for further discussion
- Forums
- ASX - By Stock
- NRZ
- Ann: Petroleum Production Licence issued
Ann: Petroleum Production Licence issued, page-36
-
- There are more pages in this discussion • 72 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NRZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.724M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NRZ (ASX) Chart |
Day chart unavailable
The Watchlist
EL8
ELEVATE URANIUM LTD
Murray Hill, MD & CEO
Murray Hill
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online