Folks,
My thoughts only ...
A long dry spell away from exploration activity and PSA are making up for it now ...
Mystic Bayou result should come through within two (2) weeks ... Before end of June 2015
Northeast Starks should spud within (2) weeks ... with some luck we may get a result before end of June 2015
North Cossinade should spud within two weeks ... results probably won't be through until July 2015
Hummer (Main Pass 273/274) spuds by the end of June 2015 ... don't expect to know much until August 2015 ...
Amidst all these opportunities there has to be some success envisaged ...
I'm greedy I'm want success with the lot ...
- Forums
- ASX - By Stock
- Ann: Petsec Energy Announces Drilling at Mystic Bayou Field
Folks, My thoughts only ... A long dry spell away from...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)