PDI 2.56% 19.0¢ predictive discovery limited

The problem is that a lot of the newer projects are lower...

  1. 4,286 Posts.
    lightbulb Created with Sketch. 1868
    The problem is that a lot of the newer projects are lower quality in terms of scale, grade, metallurgy compared to deposits that were discovered 20 years ago.

    It's entirely possible for a higher quality project to have a good AISC that is below majors etc. African projects tend to have better grade, be close to surface and with pretty good metallurgy.

    Perseus' Yaoure would be a good example in recent years. AISC in feasibility (~2019) was US$734/oz in the first five years. It's been within 5-10% of that for the first three years despite the cost for the rest of the industry being ~25% up (my estimate), although creeping up more now.
 
watchlist Created with Sketch. Add PDI (ASX) to my watchlist
(20min delay)
Last
19.0¢
Change
-0.005(2.56%)
Mkt cap ! $444.4M
Open High Low Value Volume
20.0¢ 20.0¢ 19.0¢ $1.441M 7.380M

Buyers (Bids)

No. Vol. Price($)
6 611462 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 228628 5
View Market Depth
Last trade - 16.10pm 20/05/2024 (20 minute delay) ?
Last
19.5¢
  Change
-0.005 ( 0.05 %)
Open High Low Volume
19.5¢ 19.5¢ 19.5¢ 3345276
Last updated 15.58pm 20/05/2024 ?
PDI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.