MM8 1.75% 5.8¢ medallion metals limited.

Ann: PFS demonstrates technical and commercial viability of RGP, page-17

  1. 2,511 Posts.
    lightbulb Created with Sketch. 396
    Problem is it's a terrible market to be building mines. Labour shortages and cost blowouts make these greenfield projects higher risk.

    PFS was solid though
 
watchlist Created with Sketch. Add MM8 (ASX) to my watchlist
(20min delay)
Last
5.8¢
Change
0.001(1.75%)
Mkt cap ! $17.84M
Open High Low Value Volume
5.8¢ 6.0¢ 5.5¢ $50.78K 874.4K

Buyers (Bids)

No. Vol. Price($)
1 18000 5.8¢
 

Sellers (Offers)

Price($) Vol. No.
6.0¢ 74552 1
View Market Depth
Last trade - 13.08pm 21/05/2024 (20 minute delay) ?
Last
5.9¢
  Change
0.001 ( 7.27 %)
Open High Low Volume
5.9¢ 5.9¢ 5.5¢ 222927
Last updated 11.44am 21/05/2024 ?
MM8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.