MM8 4.00% 4.8¢ medallion metals limited.

Ann: PFS demonstrates technical and commercial viability of RGP, page-17

  1. 2,515 Posts.
    lightbulb Created with Sketch. 398
    Problem is it's a terrible market to be building mines. Labour shortages and cost blowouts make these greenfield projects higher risk.

    PFS was solid though
 
watchlist Created with Sketch. Add MM8 (ASX) to my watchlist
(20min delay)
Last
4.8¢
Change
-0.002(4.00%)
Mkt cap ! $14.76M
Open High Low Value Volume
5.0¢ 5.0¢ 4.8¢ $35.80K 743.4K

Buyers (Bids)

No. Vol. Price($)
1 72340 4.7¢
 

Sellers (Offers)

Price($) Vol. No.
5.1¢ 79691 1
View Market Depth
Last trade - 15.42pm 07/06/2024 (20 minute delay) ?
Last
4.8¢
  Change
-0.002 ( 2.04 %)
Open High Low Volume
4.8¢ 4.9¢ 4.8¢ 121410
Last updated 15.41pm 07/06/2024 ?
MM8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.