we are due for an update for the re-cap process, operation and PFS.
The PFS projected all-in sustaining cost of $2015/oz and estimated $73 million in capital expenditure would be needed.
The PFS was based on A$3084 (for pre-tax NPV8 $282 million).
Now the pog price is nearly $700 higher on A$3760, this will dramatically boost the viability of the project.
Wiluna will be back.