EMH 0.00% 29.0¢ european metals holdings limited

Ann: PFS Update Delivers Outstanding Results, page-6

  1. 7,602 Posts.
    lightbulb Created with Sketch. 959
    PFS UPDATE DELIVERS OUTSTANDING RESULTS
    75% INCREASE IN CINOVEC NPV TO US$1.94B
    16% INCREASE IN PRODUCTION TO 29,386TPA
    HIGHLIGHTS1
    • The 2019 PFS Update for the Cinovec Project has been updated to demonstrate the effect of
    changes in the mining process to incorporate the use of paste backfill, which results in an
    increase in annual production, together with changes in lithium and by-product prices to reflect
    current and expected market conditions.
    • Annual production of battery grade lithium hydroxide monohydrate modelled to increase from
    25,267 tpa to 29,386 tpa, an increase of 16%.
    • NPV8 (post tax) increases from US$1.108B to US$1.938B, an increase of 74.9%, based upon a
    lithium hydroxide price of USD17,000 per tonne which is significantly less than the current price.
    • Post tax IRR of 36.3% and a payback period of 2.5 years from the commencement of production.
    • Up-front capital cost due to backfilling plant and additional capital costs to produce 29,386 tpa
    lithium hydroxide increased to US$644m.
    • This 2022 PFS Update assumes the life of mine extraction of 13.1% of the Measured and Indicated
    JORC Resources at Cinovec.
    • Use of tailings for backfill will result in a far smaller environmental impact, further enhancing the
    Project’s already strong ESG credentials.
 
watchlist Created with Sketch. Add EMH (ASX) to my watchlist
(20min delay)
Last
29.0¢
Change
0.000(0.00%)
Mkt cap ! $60.15M
Open High Low Value Volume
30.0¢ 30.0¢ 29.0¢ $2.975K 10.25K

Buyers (Bids)

No. Vol. Price($)
1 6300 28.5¢
 

Sellers (Offers)

Price($) Vol. No.
30.0¢ 34878 1
View Market Depth
Last trade - 13.15pm 12/07/2024 (20 minute delay) ?
EMH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.