HAHAHA. nah, I'm actually offloading, but my point is with the heads in the 5's, the options should be in the 3's. Way undervalued, but as I've said here before, they only worth what the market is willing to pay.
- Forums
- ASX - By Stock
- ZEU
- Ann: Phase 1 Drill Campaign Underway at Mortimer Hills Project
Ann: Phase 1 Drill Campaign Underway at Mortimer Hills Project, page-14
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ZEU (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.133M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ZEU (ASX) Chart |
Day chart unavailable