it probably won't be a cover up. it is rather a more economical and, above all, faster solution.if you assume 60,000tpa directly, you would probably expect a capex between us$1,400,000,000 (us$23,000/t) - us$1,700,000,000 (us$28,000/t). this would be roughly within the scope of other projects or below the assumptions of the pea. due to the modular structure, the costs are very likely to be reduced, which leads to a higher probability of feasibility.
- Forums
- ASX - By Stock
- GLN
- Ann: Phase 1 HMW DFS Delivers Compelling Economic Results
Ann: Phase 1 HMW DFS Delivers Compelling Economic Results, page-124
-
- There are more pages in this discussion • 263 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.0¢ |
Change
0.010(9.09%) |
Mkt cap ! $71.52M |
Open | High | Low | Value | Volume |
11.5¢ | 12.0¢ | 11.0¢ | $266.6K | 2.301M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 25960 | 11.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.0¢ | 281582 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25960 | 0.115 |
9 | 2021996 | 0.110 |
23 | 632483 | 0.105 |
53 | 3605319 | 0.100 |
4 | 151808 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.120 | 156582 | 4 |
0.125 | 481166 | 10 |
0.130 | 307500 | 5 |
0.135 | 983914 | 3 |
0.140 | 109000 | 3 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
GLN (ASX) Chart |