MOH 0.00% 0.5¢ moho resources limited

Ann: Phase 1 RC Drilling Completed at East Sampson Dam, page-17

  1. 1,704 Posts.
    lightbulb Created with Sketch. 45
    Having completed their drilling on 16 July I think we should be seeing those results either later this week or next, and then the fun really begins...

    NEXT STEPS:
    • Phase 1 assay results – expected August, 2020
    • Preliminary metallurgical testwork results – expected
    August, 2020
    • Phase 2 RC drill program (25 RC holes; ~2,100m) – Q3,
    2020
    • Diamond drilling (6 holes, ~600m) for structural,
    geotechnical and metallurgical studies – Q3, 2020
    • Infill auger sampling of existing gold anomalies – Q4, 2020
    • Aircore drilling of auger gold anomalies and geophysical
    targets within M27/263 – Q4, 2020
    • Maiden JORC 2012 Mineral Resource – Q4 2020
    • Scoping Study – Q1, 2021
 
watchlist Created with Sketch. Add MOH (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $2.426M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
17 4991972 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 745046 1
View Market Depth
Last trade - 16.12pm 27/08/2024 (20 minute delay) ?
MOH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.