Yes, we've gone from 2% in the feasibility study to build a Swedish Plant to 76%!
Would be interesting to see the figures re-worked, I'm, guessing the NPV would now be dramatically higher.
- Forums
- ASX - By Stock
- Ann: Phase 2 Graphene Plant Commissioning Complete-TLG.AX
Yes, we've gone from 2% in the feasibility study to build a...
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TLG (ASX) to my watchlist
|
|||||
Last
50.5¢ |
Change
-0.020(3.81%) |
Mkt cap ! $191.9M |
Open | High | Low | Value | Volume |
51.5¢ | 52.5¢ | 50.0¢ | $326.9K | 642.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 194326 | 50.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
51.0¢ | 27138 | 20 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 195256 | 0.505 |
29 | 196662 | 0.500 |
10 | 27507 | 0.495 |
9 | 122566 | 0.490 |
1 | 5100 | 0.485 |
Price($) | Vol. | No. |
---|---|---|
0.510 | 27138 | 20 |
0.515 | 55834 | 17 |
0.520 | 108770 | 9 |
0.525 | 51903 | 5 |
0.530 | 58400 | 6 |
Last trade - 14.23pm 17/07/2024 (20 minute delay) ? |
Featured News
TLG (ASX) Chart |