ANL 0.00% 0.1¢ amani gold limited

Ann: Phase One Drilling Completed at Kebigada, Giro Gold Project, page-4

  1. 708 Posts.
    lightbulb Created with Sketch. 156
    ASX ANNOUNCEMENT
    14 October 2019
    PHASE ONE DIAMOND CORE DRILLING
    COMPLETED AT KEBIGADA DEPOSIT, GIRO
    GOLD PROJECT
    Highlights
    • Phase One diamond core drilling operations completed at
    Kebigada gold deposit, Giro Gold Project (drillholes GRDD034 and
    GRDD035).
    • Drilling targeted deeper high-grade sulphide associated gold
    mineralisation within the central core of Kebigada deposit.
    • Review of GRDD034 and GRDD035 drill core indicates broad
    visual intervals of rock type and sulphide mineralisation which is
    similar to adjacent drillholes GRDD025 and GRDD032 which
    intersected significant gold mineralisation. Assay results are
    pending.
    • Hole GRDD034 completed at 414.9m with core samples
    submitted to SGS Mwanza laboratory (Tanzania). Assay results
    are expected late-October.
    • Hole GRDD035 completed at 546.5m with core samples selected
    for submission to SGS Mwanza laboratory (Tanzania). Assay
    results are expected mid-November.
    • If significant gold mineralisation has been intersected in Priority
    One holes, Phase Two drilling may comprise a further 4 core
    holes, each 500m in length.
    Amani Gold Limited (“Amani”) is pleased to announce that Phase One
    diamond core drilling operations (drillholes GRDD034 and GRDD035) have
    been completed at the Kebigada gold deposit, Giro Gold Project (see ASX
    Announcement 22 August 2019).
    Drilling targeted deeper high-grade gold mineralisation within the central
    core of Kebigada deposit.
    page 2
    ASX ANNOUNCEMENT – 14 OCTOBER 2019
    Drillhole GRDD034 was completed at 414.9m with core samples submitted to SGS Mwanza laboratory
    (Tanzania). Assay results are expected late-October. Drillhole GRDD035 completed at 546.5m with
    core samples selected for submission to SGS Mwanza laboratory (Tanzania). Assay results are
    expected mid-November. The initial Phase One diamond core drillhole GRDD033 was abandoned at a
    depth of 74.6m due to significant deflection after crossing a fracture zone. Total drilling completed in
    Phase One was 1,036m.

 
watchlist Created with Sketch. Add ANL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.