all reads very pos, starting today hopefully. Those who sold need their head read imo but each to their own. Hold hold hold.
- Forums
- ASX - By Stock
- ELE
- Ann: Phase Two Wet Plant - Component Full Load Testing Continues
Ann: Phase Two Wet Plant - Component Full Load Testing Continues, page-2
-
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ELE (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.27M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
ELE (ASX) Chart |
Day chart unavailable