Well the announcement says, "By the end of the week Rig-1 will commence to drill out the junk in the hole at approximately 2,195 metres. After removal of the junk from the hole, the oil bearing sandstone reservoirs located between 2,175-2,233 metres will be perforated and flow tested."
So I REALLY HOPE that it doesn't take until after Xmas! Surely it won't take 3 weeks to drill 2,000m??
- Forums
- ASX - By Stock
- GGX
- Ann: Philippines Operations Update
Ann: Philippines Operations Update , page-3
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.077M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GGX (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online