GGX 0.00% 0.1¢ gas2grid limited

Well the announcement says, "By the end of the week Rig-1 will...

  1. 142 Posts.
    Well the announcement says, "By the end of the week Rig-1 will commence to drill out the junk in the hole at approximately 2,195 metres. After removal of the junk from the hole, the oil bearing sandstone reservoirs located between 2,175-2,233 metres will be perforated and flow tested."

    So I REALLY HOPE that it doesn't take until after Xmas! Surely it won't take 3 weeks to drill 2,000m??
 
watchlist Created with Sketch. Add GGX (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.