Goslogo - the odds are VERY good that we will have a result next week. The Malolos well is already drill to 2,175m. There is a concrete plug there of about 20-30m depth. Once that is drilled (which shouldn't take that long) the oil reservoir is 10m below that. It should be noted (& this is what most long term GGX holders are hoping for) that they have previously tapped oil from this exact well (before it was plugged with concrete - why I don't know it was plugged but that's past history). So we & GGX actually know that oil IS THERE. It's just how much & at what flow rate that will put the cat into the pigeon coup (& excite the sp). The gas (in the same well) is & will be a bonus if it flow tests at a sufficient rate to warrant commercial extraction. Fingers crossed for the day we break the concrete plug in Malolos! It shouldn't be that long a wait, maybe a week but shouldn't be much more. People selling now are quite silly!
- Forums
- ASX - By Stock
- GGX
- Ann: Philippines Operations Update
Ann: Philippines Operations Update , page-9
-
- There are more pages in this discussion • 11 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GGX (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.077M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
GGX (ASX) Chart |
Day chart unavailable