Just thinking,
All the talk is about WAITING for, soil sample results, AEM/VTEM results, HERITAGE, drilling targets etc. Somewhere along the lines after AEM results or study for drill targets to be where located. the company needs to lodge with the mines dept APPLICATION FOR DRILLING. Do we need to wait for HERITAGE approval first before they can be lodged and if so APPROVALS can take a while to be assessed and APPROVED before the drilling contractor can be engaged to start.
So is it likely that drilling wont happen so soon and could be at least another month or 2 or 3 before they start.??????????????????
- Forums
- ASX - By Stock
- Ann: Phils Hill Additional Conductors Highly Prospective
Just thinking,All the talk is about WAITING for, soil sample...
- There are more pages in this discussion • 102 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.72M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $4.85K | 950K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 2607275 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 9790370 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 2607275 | 0.005 |
54 | 40607459 | 0.004 |
19 | 11378719 | 0.003 |
12 | 10139000 | 0.002 |
8 | 17100000 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 9665370 | 8 |
0.007 | 9338737 | 8 |
0.008 | 2720001 | 4 |
0.009 | 3596691 | 7 |
0.010 | 2670000 | 9 |
Last trade - 10.23am 26/04/2024 (20 minute delay) ? |
|
|||||
Last
0.6¢ |
  |
Change
0.000 ( 20.0 %) |
|||
Open | High | Low | Volume | ||
0.6¢ | 0.6¢ | 0.6¢ | 20000 | ||
Last updated 12.00pm 26/04/2024 ? |
Featured News
PUR (ASX) Chart |