It sits in a separate trap between 2 main faults, 13-14kms south of P#1. Do chk out slide-10 of their May preso which shows this structure in detail.
Given the lack of other faults it should b a relatively uncomplicated structure for Apache to drill out to the target Lower Keraudren Sandstone (LKS).
The LKS has a regional seal called Cossigny Carbonate, abt 120m thick & then apprx 1100m of the LKS till TD with the different 'gas' sand packages.
Here's a look at the P#1 log that I've marked up.
The A, B & C sands with a thickness of 110m were gas charged, but BP didn't test them. There were 4 other deep sands till TD of 4880m. So I'd say PS#1 should b targeting a TD of ~4900-5000m (10 weeks of drilling-results by July). I hope they flowtest these if all looks good.
Atwood Eagle's going steady, has another 260kms (or 139 Naut Miles) to ETA. At 3.2 NM/hr that's apprx 43 hrs of tow time.
- Forums
- ASX - By Stock
- CVN
- Ann: Phoenix South-1 Well Spud Confirmation
Ann: Phoenix South-1 Well Spud Confirmation , page-21
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
-0.005(3.03%) |
Mkt cap ! $286.2M |
Open | High | Low | Value | Volume |
16.0¢ | 16.0¢ | 15.5¢ | $290.1K | 1.827M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 1159858 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 282662 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 1159858 | 0.155 |
11 | 1113924 | 0.150 |
18 | 717263 | 0.145 |
16 | 690994 | 0.140 |
4 | 444408 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 282662 | 5 |
0.165 | 1114685 | 13 |
0.170 | 641240 | 16 |
0.175 | 388438 | 5 |
0.180 | 415439 | 10 |
Last trade - 16.10pm 14/11/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |