350k/d USD is just for the rig.
With numerous contractors on board, ballpark for offshore drilling is US800k-1 mil.
A 5000+m depth well takes 10-12 wks on a trouble free basis for different casing sizes to b run (36" conductor, 17.5", 13 3/8", 9", 7" & 5" liner) alongwith cementing, wireline logging crew, LWD/MWD crew, WSGeo's, Loggers, Mud doctor, ROV dudes & the rest of the Drilling Personnel & ship crew. That's the smooth sail scenario.
Usual hiccups (other then cyclone related evac's) occur whilst handling over-pressure zones, taking gas/water kicks or well control, stuffed casing job or liner, sidetracking, stuck wireline tool & delay for a fishing job. Each well is different as per the province.
Quadrant should b wiser this time around, after PS#1 turned into PS-ST1 & PS-ST2.
Chk PS#2 progress from wk-1 December onwards.
- Forums
- ASX - By Stock
- CVN
- Ann: Phoenix South-2 Well Commencement-CVN.AX
Ann: Phoenix South-2 Well Commencement-CVN.AX, page-61
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $348.8M |
Open | High | Low | Value | Volume |
20.0¢ | 20.0¢ | 19.5¢ | $59.73K | 298.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
19 | 1789407 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.0¢ | 371738 | 12 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 1789407 | 0.195 |
25 | 1933675 | 0.190 |
20 | 2512817 | 0.185 |
13 | 914372 | 0.180 |
8 | 391722 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.200 | 371743 | 13 |
0.205 | 1223503 | 21 |
0.210 | 1164444 | 19 |
0.215 | 372242 | 7 |
0.220 | 857783 | 18 |
Last trade - 12.45pm 05/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |