350k/d USD is just for the rig.
With numerous contractors on board, ballpark for offshore drilling is US800k-1 mil.
A 5000+m depth well takes 10-12 wks on a trouble free basis for different casing sizes to b run (36" conductor, 17.5", 13 3/8", 9", 7" & 5" liner) alongwith cementing, wireline logging crew, LWD/MWD crew, WSGeo's, Loggers, Mud doctor, ROV dudes & the rest of the Drilling Personnel & ship crew. That's the smooth sail scenario.
Usual hiccups (other then cyclone related evac's) occur whilst handling over-pressure zones, taking gas/water kicks or well control, stuffed casing job or liner, sidetracking, stuck wireline tool & delay for a fishing job. Each well is different as per the province.
Quadrant should b wiser this time around, after PS#1 turned into PS-ST1 & PS-ST2.
Chk PS#2 progress from wk-1 December onwards.
- Forums
- ASX - By Stock
- Ann: Phoenix South-2 Well Commencement-CVN.AX
350k/d USD is just for the rig. With numerous contractors on...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
16.5¢ |
Change
0.005(3.13%) |
Mkt cap ! $295.1M |
Open | High | Low | Value | Volume |
15.5¢ | 16.5¢ | 15.5¢ | $556.2K | 3.435M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 271853 | 16.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.5¢ | 468186 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 271853 | 0.160 |
9 | 721337 | 0.155 |
14 | 953194 | 0.150 |
7 | 456088 | 0.145 |
6 | 314592 | 0.140 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 468186 | 5 |
0.170 | 549928 | 10 |
0.175 | 662192 | 9 |
0.180 | 1346600 | 11 |
0.185 | 1800021 | 12 |
Last trade - 16.10pm 25/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |