CVN 2.94% 16.5¢ carnarvon energy limited

Ann: Phoenix South-3 Drilling Update, page-3

  1. 1,338 Posts.
    lightbulb Created with Sketch. 218
    267m in 3 days and only 741m to go, that means we are some 7-9 days before target depth is achieved.

    Not sure why this is price sensitive, but it's good progress nonetheless (or perhaps someone that knows more about this can educate me?). Thanks
    Last edited by vladisimo: 31/05/18
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.