MNB 1.52% 6.5¢ minbos resources limited

Phase1design for civil engineering...

  1. 21,292 Posts.
    lightbulb Created with Sketch. 881

    Phase1design for civil engineering works,includingearthworksanddrainage are complete(Figures2-3).The contract has been agreed and is ready to sign. A formal tender process is under way and work can commence when the contract is awarded.




    Phase2designforStructural,Mechanical,ElectricalandProcesscontrolis substantially complete with packages ready for pricing and contracting.




    Why would Angolan banks risk their capital with so many uncertainties - ready to sign and then a formal tender process lol

    and phase 2 - ready for pricing and contracting lol

    Construction if ever gets under way - will be a debacle like the past 3-4 years

    Hence SP more than 50% down from last 2022 11c CR

    Forget 2025 growing season - time for 27c or 37c fantasy projections to be adjusted downwards
    IMO
    Last edited by Merchant2000: 21/05/24
 
watchlist Created with Sketch. Add MNB (ASX) to my watchlist
(20min delay)
Last
6.5¢
Change
-0.001(1.52%)
Mkt cap ! $57.11M
Open High Low Value Volume
6.7¢ 6.7¢ 6.5¢ $8.048K 123.4K

Buyers (Bids)

No. Vol. Price($)
3 78153 6.5¢
 

Sellers (Offers)

Price($) Vol. No.
6.7¢ 40000 2
View Market Depth
Last trade - 10.32am 30/08/2024 (20 minute delay) ?
MNB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.