ADV 0.00% 13.5¢ ardiden ltd

Ann: Pickle Lake Gold Project Exploration Update, page-67

  1. 1,127 Posts.
    lightbulb Created with Sketch. 355
    Only possible upside in the next couple weeks is if the permit for Esker is approved which was mentioned possibly for February. South limb drill results you would think are at least 4 weeks away and if they are poor they will be more likely 6 weeks plus and shuffled in and hidden in another announcement. Kas winter drilling news should be announced at the end of the month as they have already drilled 950 of the 1500 meter program at south limb so the drill rig should be over the lake at the end of this month or beginning of March. Was not overly excited for South Limb but feel like we need to have some decent results out of it to gain any kind of momentum as Kas lake drill results wont be in realistically until April. The updated JORC is not coming anytime soon after the mediocre summer drill program. Hopefully we get some movement on the lithium as the gold front could be uneventful for a month or so
 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
(20min delay)
Last
13.5¢
Change
0.000(0.00%)
Mkt cap ! $8.439M
Open High Low Value Volume
13.5¢ 13.5¢ 13.5¢ $722 5.349K

Buyers (Bids)

No. Vol. Price($)
4 18695 13.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 103720 2
View Market Depth
Last trade - 16.10pm 12/09/2024 (20 minute delay) ?
ADV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.