ASX/Media Announcement 6 September 2016
PILBARA COMPLETES KEY METALLURGICAL TESTWORK PROGRAM
AHEAD OF PILGANGOORA DEFINITIVE FEASIBILITY STUDY
Phase 2 metallurgical testwork and process design completed – DFS to be released this month
Key Points:
Comprehensive Phase 2 metallurgical testwork program now completed, allowing the process
flowsheet to be finalised for inclusion in the Definitive Feasibility Study (DFS).
Overall recoveries range between 76% to 78.1% Li2O and significant Ta2O5 recovery improvements in
the range of 51% to 59.3%.
The proposed three stages of Heavy Media Separation (HMS) outlined in the March PFS has now been
reduced to just two stages as a result of the Phase 2 Heavy Liquid Separation (HLS) testwork, which will
simplify operability.
Comprehensive spodumene flotation testwork has been completed with further optimisation work
underway.
A Pilot Plant testwork program has commenced on the HMS phase – flotation program to follow.
A 4Mtpa Primary Crusher will be installed upfront to facilitate early expansion capability of the project.
The DFS encompassing a 2Mtpa base case development of the Pilgangoora Project, together with a PFS
on a 4Mtpa expansion in Year 3, is now in its final stages and will be announced to the market towards
the end of September following review by the Pilbara Minerals Board.
Australian lithium developer Pilbara Minerals Limited (ASX: PLS) is pleased to advise that it has completed the
Phase 2 metallurgical testwork program, representing one of the final work streams for the Definitive Feasibility
Study (DFS) on its flagship 100%-owned Pilgangoora Lithium-Tantalum Project in WA. With the completion of
this key metallurgical testwork program, the DFS has now entered into its final review and compilation stage, and
is expected to be announced to the market towards the end of this month following review by the Pilbara
Minerals Board.
Whilst the substantial growth in the Pilgangoora Resource and Reserve during the year has necessitated
additional site design works to complete the DFS, it has also facilitated an assessment of the expansion
opportunities at the Pilgangoora Project.
This, combined with additional engineering completed during the DFS, means that the Company has been able to
progress a Prefeasibility level of assessment for the 4Mtpa production case. These results will be published at the
same time as the release of the DFS outlining the 2Mtpa base case.
“The scale of the Pilgangoora Resource and Reserve, combined with its distinct location and grade advantages,
will underpin a low-cost operation which should be the ‘go-to’ hard-rock lithium project for expanded raw
material supply. We look forward to demonstrating its potential,” said Pilbara’s Managing Director and CEO, Ken
- Forums
- ASX - By Stock
- PLS
- Ann: Pilbara Completes Key Metallurgical Testwork Program-PLS.AX
Ann: Pilbara Completes Key Metallurgical Testwork Program-PLS.AX, page-2
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLS (ASX) to my watchlist
|
|||||
Last
$2.98 |
Change
-0.030(1.00%) |
Mkt cap ! $8.804B |
Open | High | Low | Value | Volume |
$2.93 | $3.01 | $2.89 | $38.09M | 12.94M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
31 | 150522 | $2.97 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.98 | 53526 | 33 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
60 | 123457 | 2.980 |
25 | 189792 | 2.970 |
23 | 166810 | 2.960 |
18 | 254994 | 2.950 |
15 | 215783 | 2.940 |
Price($) | Vol. | No. |
---|---|---|
2.990 | 220850 | 69 |
3.000 | 208359 | 45 |
3.010 | 210660 | 29 |
3.020 | 216262 | 28 |
3.030 | 379576 | 25 |
Last trade - 12.50pm 10/07/2024 (20 minute delay) ? |
Featured News
PLS (ASX) Chart |
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online