Given the downturn there should be some top quality PM's out there just itching to sink their teeth into a project like this. The few positives that I can see is the closeness to Port Hedland and the fact that the site is accessible via a bitumen road, therefore reducing the time required to transport equipment in. There should be quite a number of surplus tradies sitting round who would be able to jump easily into the construction phase and also being a surplus there should be quite a lot of competition to overall costs (benefit for cost savings) but also in timings, therefore in my opinion the construction may not be as long as historical construction projects due to the desire to produce results....IMO...
- Forums
- ASX - By Stock
- Ann: Pilgangoora - Native Title Agreement & Project Update-AJM.AX
Given the downturn there should be some top quality PM's out...
-
- There are more pages in this discussion • 27 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
NVA
Nova locks in NASDAQ US market listing at a value of only US$3.3M as ASX gets quieter and quieter
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
Add 1MC (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.4¢ |
Change
0.001(2.33%) |
Mkt cap ! $10.87M |
Open | High | Low | Value | Volume |
4.4¢ | 4.4¢ | 4.4¢ | $4.787K | 108.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 194992 | 4.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 126464 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 194992 | 0.043 |
1 | 49886 | 0.042 |
4 | 226951 | 0.041 |
6 | 246083 | 0.040 |
1 | 18000 | 0.039 |
Price($) | Vol. | No. |
---|---|---|
0.044 | 126464 | 3 |
0.045 | 151356 | 5 |
0.046 | 21739 | 1 |
0.047 | 45000 | 1 |
0.048 | 20833 | 1 |
Last trade - 14.14pm 29/07/2024 (20 minute delay) ? |
Featured News
1MC (ASX) Chart |