    Does anyone have more granular estimates than Q3?

    This announcement says:
    >Award of the Definitive Feasibility Study (DFS) process design to DRA Pacific Pty Ltd
    >Further updates will be provided as they come to hand with delivery of the DFS during Q3 2016

    When did that occur? I have seen some articles from June 8 mentioning AJM and DRA but they are talking about
    >preliminary engineering and design of the processing facilities
    (http://www.miningweekly.com/article...oject-by-altura-mining-2016-06-08/rep_id:3650)

    Is that the DFS or another piece of work that DRA are doing.

    Also, what would be the average timeline for a DFS? A month, two, three?
 