THR 0.00% 1.6¢ thor energy plc

Ann: Pilot Mountain Drilling Exceeds Expectations, page-2

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 2,928 Posts.
    lightbulb Created with Sketch. 645
    Thor Mining shares strengthened as Nevada drilling exceeds expectations
    Share
    14:45 15 Mar 2017
    The company owns the Pilot Mountain tungsten project in the US state of Nevada
    http://www.*.co.uk/thumbs/upload/Article/Image/2017_03/757z468_thor.png
    Thor has been drilling out core at the project in Nevada
    Thor Mining PLC (LON:THR, ASX:THR) chairman Mick Billing said the group's drilling programme has “substantially exceeded expectations”, pushing the shares up 5%.

    The company owns the Pilot Mountain tungsten project in the US state of Nevada and recently completed the first round of work on the Desert Scheelite portion.

    The highlight was 51-metres of a rock-type called skarn containing scheelite, which is rich in a tungsten bearing material. Nine metres of the sample contained visible sulphide mineralisation.

    It was intersected 25-metres to the east and 50-metres closer to the surface than the high-grade Desert Scheelite intersection from the 2012. Called DSDD015, the hole found 17.5 -metres at 5.7% copper equivalent.

    While this “very encouraging” drill intersection appears to be comparable with the intersection of DSDD15, Thor says assay results will be required to confirm the actual metal content.

    The 15-metres of mineralised skarn from the third hole “is consistent with our expectations and highlights the strong potential for continued extension of Desert Scheelite to the east and at depth”, said Billing.

    The company is now planning the follow-up programme at Desert Scheelite.

    The objective of this initial programme was to test for extensions to the high grade mineralisation found at DSDD015.

    The first hole was designed to test for mineralisation 100-metres vertically above DSDD15, but failed to find mineralisation due to what appears to be fault displacement.

    The second targeted mineralisation 75 metres above and 25 metres to the east of DSDD15 and found the 51 metres of visible scheelite mentioned above from 142 metres.

    Hole-three targeted a further 25 metres to the east of the and hit mineralisation from around 125 metres.

    "Subject to the receipt of assays, the Pilot Mountain drilling program has substantially exceeded expectations,” said Billing.

    At 2.30pm, the shares were changing hands for 1.39p, up 0.06p.

    http://www.*.co.uk/companies/news/1...ada-drilling-exceeds-expectations-174851.html

    Share
    http://www.*.co.uk/thumbs/upload/Team/Image/2015_07/50x50_Ian_55ae0ddd437b7.jpg
    Ian Lyall

    WHY INVEST IN THOR MINING PLC? READ MORE HERE
 
watchlist Created with Sketch. Add THR (ASX) to my watchlist
(20min delay)
Last
1.6¢
Change
0.000(0.00%)
Mkt cap ! $3.865M
Open High Low Value Volume
1.6¢ 1.6¢ 1.6¢ $18.63K 1.164M

Buyers (Bids)

No. Vol. Price($)
1 435114 1.6¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 201215 4
View Market Depth
Last trade - 12.56pm 04/11/2024 (20 minute delay) ?
THR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.