Looking good, political upheavals or not:
• Drilling to test extensions to mineralisation at Morila Pit 5 has returned further excellent results including:
➢ 58m at 1.75g/t gold from 91m in SE97;
➢ 16m at 3.98g/t gold from 88m in SE93;
➢ 18m at 2.17g/t gold from 39 m, and 9m at 3.83g/t gold from 91m in SE87;
➢ 33m at 1.04g/t gold from 73 m in SE88; and
➢ 6m at 4.12g/t gold from 76 m in SE95.
• Results confirm the thickness and tenor of mineralisation present outside the previously mined Morila Super Pit, with positive implications for high-grade mineralisation elsewhere at Morila.
• Diamond drilling has commenced at Morila Super Pit at the NE target.
Add to My Watchlist
What is My Watchlist?