The location of that 58 meters @ 1.75 g/t Au basically connects pit 5 to the expanded Morilla pit design.
What was potentially overburden on the expanded Morilla pit is now cash. This is going to lower the AISC on all that gold in the pitt. Plus, yeah lots more gold.