"plans underway to fully develop" = the much-touted but faceless and nameless geology team needs some more ad-hoc work
"plans underway to fully develop" = we're going to do some soil and rock chip sampling once we get approvals
"previous work confirmed the known orebody commences from surface" = our geology team fell into the old open pit
"open to the north, east and down-dip"...north is down-dip t'be sure, t'be sure, the four most easterly holes have grades of 0, 0, 0 and 0.2.
"plans underway to fully develop" = based on the soil and rock chip sampling we may be able to design a drilling program
Me, I'd love to see orebody model cross-sections overlain by the drill intercepts to support the MR estimate of 2.1Mt. My estimate is 0.15Mt.
"plus ca change"
GALAH
- Forums
- ASX - By Stock
- CCZ
- Ann: Plans to Develop the Big One Deposit at Mt Isa Copper Belt
Ann: Plans to Develop the Big One Deposit at Mt Isa Copper Belt, page-13
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.39M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $993 | 124.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 111276 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 3693212 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 111276 | 0.007 |
8 | 6430652 | 0.006 |
2 | 600200 | 0.005 |
13 | 4819835 | 0.004 |
18 | 11704034 | 0.003 |
Price($) | Vol. | No. |
---|---|---|
0.008 | 3693212 | 11 |
0.009 | 2451671 | 5 |
0.010 | 4760000 | 4 |
0.011 | 1750000 | 4 |
0.012 | 1766071 | 2 |
Last trade - 10.02am 09/10/2024 (20 minute delay) ? |
Featured News
CCZ (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online