I like that they have brought in an extra drill rig at Yarawinda to accelerate delineation, generally means to me, is they like what they see and want to uncover faster. All in all, both our exploration regions just get better with every stage.
- Forums
- ASX - By Stock
- Ann: Plus 10% Copper at Surface at Mount Squires Project
I like that they have brought in an extra drill rig at Yarawinda...
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CPN (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.9¢ |
Change
-0.002(2.47%) |
Mkt cap ! $7.636M |
Open | High | Low | Value | Volume |
7.9¢ | 7.9¢ | 7.9¢ | $2.286K | 28.93K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 46856 | 7.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.0¢ | 4462 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 45893 | 0.078 |
2 | 99458 | 0.075 |
2 | 50135 | 0.074 |
2 | 13818 | 0.073 |
2 | 56000 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.080 | 4462 | 1 |
0.081 | 49999 | 1 |
0.083 | 6000 | 1 |
0.084 | 5057 | 1 |
0.085 | 90972 | 1 |
Last trade - 12.19pm 28/05/2024 (20 minute delay) ? |
|
|||||
Last
8.0¢ |
  |
Change
-0.002 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
7.9¢ | 8.0¢ | 7.9¢ | 14559 | ||
Last updated 13.31pm 28/05/2024 ? |
Featured News
CPN (ASX) Chart |