Market update?
Whatever happened to;
A total of fourteen trenches comprising a total of 800m were excavated at the Pully prospect in March. These trenches were either extensions to existing trenches or trenches excavated along strike of known mineralization.In addition to the trench 150, -80# (mesh) soil samples were collected to close off exiting ridge and spur copper anomalism identified in 2022.
All the samples from the March program have been delivered to Intert laboratory in Lae where they are undergoing sample preparation prior to assay. The first results back from the program are due in mid- to late May.
As was written in the recent QAR?
Would management please provide an update on these PNG assays!
- Forums
- ASX - By Stock
- GMN
- Ann: PNG Update - Wabag and Green River Copper Project
Ann: PNG Update - Wabag and Green River Copper Project, page-3
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GMN (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.371M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $372 | 124K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
36 | 69730667 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 28999451 | 18 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
36 | 69730667 | 0.003 |
21 | 37689982 | 0.002 |
15 | 81840049 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 28999451 | 18 |
0.005 | 11424415 | 25 |
0.006 | 8884522 | 9 |
0.007 | 1562054 | 6 |
0.008 | 2298750 | 4 |
Last trade - 10.46am 18/06/2024 (20 minute delay) ? |
Featured News
GMN (ASX) Chart |
The Watchlist
SS1
SUN SILVER LIMITED
Gerard O'Donovan, Executive Director
Gerard O'Donovan
Executive Director
SPONSORED BY The Market Online