Hi spid81 battery grade graphite requires the removal of all contaminants…The removal of ash content can not be dismissed…SYR receive a lower price without the removal of contaminants
Lindi only need provide at spec for expandable and coatings markets and receive a premium…How are you going with those Mpa results of SYR host rock material and of the Graphite…They should be in your failed thesis…The BS guide for dopey
Regards Croc (Great to be heading towards commissioning…)
- Forums
- ASX - By Stock
- Ann: Poised for go live - Lindi Jumbo Mine Development Update
Hi spid81 battery grade graphite requires the removal of all...
-
- There are more pages in this discussion • 65 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WKT (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $65.78M |
Open | High | Low | Value | Volume |
9.7¢ | 9.8¢ | 9.6¢ | $48.00K | 499.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 92083 | 9.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.8¢ | 128307 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 40000 | 0.096 |
4 | 140480 | 0.095 |
4 | 207400 | 0.094 |
2 | 58543 | 0.093 |
2 | 18924 | 0.092 |
Price($) | Vol. | No. |
---|---|---|
0.098 | 38307 | 2 |
0.099 | 40300 | 1 |
0.100 | 33728 | 1 |
0.105 | 75598 | 2 |
0.110 | 192833 | 4 |
Last trade - 15.22pm 13/09/2024 (20 minute delay) ? |
Featured News
WKT (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online