KAR 2.22% $1.38 karoon energy ltd

"There is currently insufficient information to assess the...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,826 Posts.
    lightbulb Created with Sketch. 7
    "There is currently insufficient information to assess the reservoir and hydrocarbon characteristics of these secondary
    Montara sands"

    so that is basically saying that there are hydrocarbons present in those sands...right?




    POSEIDON-2 EXPLORATION WELL IN WA-398-P PROGRESS REPORT NO 8

    Since the last report the 7” liner was set and cemented at 4700 metres (mRT), the well was drilled to 4729 metres from
    4724 metres and coring operations were conducted over the interval 4729 to 4741 metres.

    At 0600 hrs WST today the core barrel was being pulled from the hole.

    The Montara Formation is a secondary target and lies above the Plover Formation primary target which was drilled in the
    Poseidon-1 discovery well.

    There is currently insufficient information to assess the reservoir and hydrocarbon characteristics of these secondary
    Montara sands. Only when a full data set is available will the significance of these sands be known.

    On completion of the core retrieval, the well will be drilled further to test the underlying Plover Formation primary target.

    The Transocean Legend semi-submersible rig is drilling the exploration well, which is operated by ConocoPhillips.

    Poseidon-2 is located in WA-398, on the southern flank of the north-east trending structural high of the greater Poseidon
    structure. The objective of the well is to test the extent, presence and quality of reservoirs down-dip from Poseidon-1
    where the Plover Formation is interpreted to thicken. The well has a planned total depth of approximately 5300 mRT.

    As with the recent gas discovery well, Poseidon-1, Poseidon-2 is planned to be plugged and abandoned following final
    well evaluation and production testing if applicable.
 
watchlist Created with Sketch. Add KAR (ASX) to my watchlist
(20min delay)
Last
$1.38
Change
0.030(2.22%)
Mkt cap ! $1.075B
Open High Low Value Volume
$1.35 $1.39 $1.34 $4.466M 3.266M

Buyers (Bids)

No. Vol. Price($)
1 15786 $1.38
 

Sellers (Offers)

Price($) Vol. No.
$1.39 1601 2
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
KAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.