SRN surefire resources nl

COMPLETION OF HYDROLOGICAL ASSESSMENT AT THE VICTORY BORE...

  1. 3,630 Posts.
    lightbulb Created with Sketch. 94
    COMPLETION OF HYDROLOGICAL ASSESSMENT
    AT THE VICTORY BORE PROJECT
    Assessment shows no predicted environmental impact from dewatering or water use
    ___________________________________________________________________________
     Surefire Resources engaged specialist hydrological and environmental consultants
    “Rockwater” to conduct a Hydrological Assessment of the Victory Bore Project’s
    proposed mining operation.
     The report concluded that dewatering rates of the proposed open pit are predicted
    to be low.
     Impacts of any dewatering are predicted to be localised and do not extend to
    existing station bores or wells.
     Significantly there are no known groundwater dependant ecosystems that will be
    impacted.
     This positive assessment will assist with Surefire’s permitting and regulatory
    requirements as it progresses the projects Pre-Feasibility Study and development
    plans.
    ___________________________________________________________________________
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $6.457M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $16.43K 8.216M

Buyers (Bids)

No. Vol. Price($)
9 4877725 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 30297852 19
View Market Depth
Last trade - 16.10pm 25/07/2025 (20 minute delay) ?
SRN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.