A fair point which i havent thought about!
If i have to guess since its being PEA level its a representative ore sampled around the area where the first 3-5 year of operation will be done, to ensure the project viability during the rapid payback period which have obviously the highest impact for a project to get financed.Please let us know if its possible what our managmeent answer was.
The other thing which i think is kinda important and i couldnt find the stage 1 milling circuit grinding parameter in other words how small the grinding will go at stage1 milling before the flotation,as the smaller the grinded material obviously the more costly it cost to do so.I already asked the Nova team,awaiting the answer.
- Forums
- ASX - By Stock
- NVA
- Ann: Positive Metallurgical Results Further Defines Flowsheet
Ann: Positive Metallurgical Results Further Defines Flowsheet, page-54
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TLX
Telix jumps 11.6% as US government indicates proposed medicare changes won't affect prostate cancer drug
SKS
SKS Technologies wins US$90M award to supply power to international hyperscale data centre in Melbourne
Add NVA (ASX) to my watchlist
|
|||||
Last
20.5¢ |
Change
-0.015(6.82%) |
Mkt cap ! $44.08M |
Open | High | Low | Value | Volume |
21.0¢ | 21.0¢ | 19.5¢ | $8.718K | 42.01K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 39956 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.5¢ | 8317 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 25000 | 0.195 |
2 | 19778 | 0.190 |
2 | 82844 | 0.185 |
5 | 76890 | 0.180 |
5 | 54999 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 8317 | 1 |
0.220 | 9188 | 2 |
0.230 | 2238 | 1 |
0.235 | 6547 | 1 |
0.240 | 23300 | 2 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
NVA (ASX) Chart |