Too early for me to give an estimate without some further research. TAW installed one in 7 months but they already had a past Ta plant on site. NZC would be a better comparison as they are installing one now for their DRC colbalt and copper project.
6.3% DMS concentrate using standard metallurgical laboratory test standards which is excellent for initial tests. This will be improved upon. Again using TAW as an example - they have managed to produce 7% using their low-grade ore with their DMS. The % of our concentrate will only improve from here.
Haplo
AVZ Price at posting:
17.0¢ Sentiment: Buy Disclosure: Held