Too early for me to give an estimate without some further research. TAW installed one in 7 months but they already had a past Ta plant on site. NZC would be a better comparison as they are installing one now for their DRC colbalt and copper project.
6.3% DMS concentrate using standard metallurgical laboratory test standards which is excellent for initial tests. This will be improved upon. Again using TAW as an example - they have managed to produce 7% using their low-grade ore with their DMS. The % of our concentrate will only improve from here.
Haplo
- Forums
- ASX - By Stock
- Ann: Positive metallurgical test work results for Manono
Too early for me to give an estimate without some further...
-
- There are more pages in this discussion • 104 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)