Pre Feasibility Study completed and scope defined for Definitive Feasibility Study
•PFS supports declaration of a maiden ore reserve of 473mt based on a 12.8Mtpa plant throughput, backed by PFS level or AACE Class 4 capital cost estimates and/or third-party service proposals1
•Optimisation of the processing plant configuration with a nominal 15.5Mtpa feed plant utilising three grinding stages, three stage magnetic separation and flotation to generate a premium grade magnetite concentrate with 67.5 - 68.5% Fe content
•Non-process infrastructure and transport studies confirm preferred scope for operating inputs and initial route selection to load annual production of between 2 and 3 Mtpa of high grade concentrate on to Cape size vessels
•Initial capital investment of US$429-$506M (A$572-$675M) resulting in optimised case results of NPV of A$669M and 20% IRR for selected go-forward case at long run average prices (post tax, ungeared)
•Preparation for a prompt commencement of Definitive Feasibility Study is well advanced with further drilling, testwork, metallurgical investigation and engineering workplans in progress
GUYS////
hahahaha.
- Forums
- ASX - By Stock
- MGT
- Ann: Positive PFS Results for Razorback Iron Ore Project
Ann: Positive PFS Results for Razorback Iron Ore Project, page-11
-
-
- There are more pages in this discussion • 186 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.72M |
Open | High | Low | Value | Volume |
14.3¢ | 14.5¢ | 13.5¢ | $19.83K | 137.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 23592 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.5¢ | 76869 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 23592 | 0.135 |
2 | 145000 | 0.125 |
2 | 22000 | 0.120 |
4 | 56223 | 0.115 |
4 | 40162 | 0.110 |
Price($) | Vol. | No. |
---|---|---|
0.145 | 76869 | 1 |
0.150 | 119850 | 3 |
0.155 | 29825 | 1 |
0.165 | 20000 | 1 |
0.170 | 8500 | 1 |
Last trade - 16.10pm 15/11/2024 (20 minute delay) ? |
Featured News
MGT (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Will Souter, CFO
Will Souter
CFO
Previous Video
Next Video
SPONSORED BY The Market Online