MGT 6.00% 26.5¢ magnetite mines limited.

Ann: Positive PFS Results for Razorback Iron Ore Project, page-285

  1. 936 Posts.
    lightbulb Created with Sketch. 903
    No, it is including premium of US$25/t for our product as indicated in pfs. (150+25)/0.75.
 
watchlist Created with Sketch. Add MGT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.