    re: Ann: Positive Results for Bundi Project S... 10:55 am Positive Results for Bundi Project Scoping Study

    Highlights
    Mine life of 28 years producing over 5 million sales tonnes on average per year
    during steady-state production
    Project NPV real, before tax, is between $600 million and $660 million at a 10%
    discount rate and the IRR, before tax is between 16% and 17%.
    Continuous coal seam amenable to underground longwall mining
    Mining seam section 2.75 – 3.65m
    Average yield from mining study 78% at 6300kcal/kg GAD
    Average cost to FOB $80.72 per tonne, excluding royalties
    Initial Capital expenditure $994 million


    9:18 am Maiden Indicated Resource for Columboola JV
    Highlights
    Maiden Indicated JORC Resource of 94.7 Mt for Columboola
    Total Resource increased by 26% to 1.7 Billion tonnes
    MetroCoal’s total thermal coal resource now 4.2 Billion tonnes