I did pose the question of delaying the SS to incorporate Skytem results further drilling etc but the consensus was that SP would get flogged. The results must be compelling to now incorporate. Personally I would have delayed.
Stuffed if you do and stuffed if you don't.
So we got a SS "Lite" for a month or so.
- Forums
- ASX - By Stock
- CLA
- Ann: Positive Scoping Study Completed on Opuwo Cobalt Project
Ann: Positive Scoping Study Completed on Opuwo Cobalt Project, page-134
-
- There are more pages in this discussion • 543 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CLA (ASX) to my watchlist
|
|||||
Last
1.3¢ |
Change
-0.001(7.14%) |
Mkt cap ! $31.56M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.2¢ | $82.70K | 6.362M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 5074193 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 4291896 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 5074193 | 0.012 |
10 | 3317909 | 0.011 |
9 | 1498999 | 0.010 |
5 | 3281630 | 0.009 |
5 | 4420074 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 4291896 | 5 |
0.015 | 2712360 | 6 |
0.016 | 5923249 | 10 |
0.017 | 971858 | 3 |
0.018 | 2550349 | 6 |
Last trade - 16.10pm 19/07/2024 (20 minute delay) ? |
Featured News
CLA (ASX) Chart |