RWD added lining to the ponds which is now not needed and what i suspect was a very hight $/t price for earth works, expect this would be a much larger driver than grade assuming the evap rates at both lakes are similar.
You can see from the numbers that once you have ticked off the ability to produce SOP (chemistry) and ability of brine to flow the driver for project value is actually in the indirects, similar to other bulk commodity projects. So transport, power and water costs, sustaining capex etc are significant or larger than mine costs. Looking at the jorc grade and recovery is just one aspect considering the capex opex split between strictly mine plant and total costs.
- Forums
- ASX - By Stock
- Ann: Positive Scoping Study for the Mackay SOP Project-AMN.AX
AMN
agrimin limited
Add to My Watchlist
0.00%
!
7.1¢

RWD added lining to the ponds which is now not needed and what i...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
7.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $27.10M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30522 | 7.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.9¢ | 4040 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 30522 | 0.071 |
1 | 285714 | 0.070 |
1 | 22000 | 0.069 |
1 | 10489 | 0.066 |
2 | 230000 | 0.061 |
Price($) | Vol. | No. |
---|---|---|
0.079 | 4040 | 1 |
0.080 | 71333 | 1 |
0.090 | 11561 | 2 |
0.100 | 247106 | 4 |
0.125 | 100000 | 1 |
Last trade - 16.12pm 18/06/2025 (20 minute delay) ? |
Featured News
AMN (ASX) Chart |
The Watchlist
MEM
MEMPHASYS LIMITED.
Professor John Aitken, Scientific Director
Professor John Aitken
Scientific Director
Previous Video
Next Video
SPONSORED BY The Market Online