RWD added lining to the ponds which is now not needed and what i...

  1. 9,111 Posts.
    lightbulb Created with Sketch. 908
    RWD added lining to the ponds which is now not needed and what i suspect was a very hight $/t price for earth works, expect this would be a much larger driver than grade assuming the evap rates at both lakes are similar.

    You can see from the numbers that once you have ticked off the ability to produce SOP (chemistry) and ability of brine to flow the driver for project value is actually in the indirects, similar to other bulk commodity projects. So transport, power and water costs, sustaining capex etc are significant or larger than mine costs. Looking at the jorc grade and recovery is just one aspect considering the capex opex split between strictly mine plant and total costs.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
7.1¢
Change
0.000(0.00%)
Mkt cap ! $27.10M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 30522 7.1¢
 

Sellers (Offers)

Price($) Vol. No.
7.9¢ 4040 1
View Market Depth
Last trade - 16.12pm 18/06/2025 (20 minute delay) ?
AMN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.