VUL’s Li resources is twice as much as PLS’s, cost is Only US$4000 to get 1 ton LiOH.H2O value at US $13000, PLS production cost is about US$ 545/t Li2O @6%, it needs around 7 ton of LiO2@6% to produce 1 ton LiOH.H2O. So just to get those ore already cost as much as the cost of VUL’s.
- Forums
- ASX - By Stock
- VUL
- Ann: Positive Scoping Study - Zero Carbon Lithium Project
Ann: Positive Scoping Study - Zero Carbon Lithium Project, page-26
Featured News
Add VUL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.63 |
Change
-0.030(0.64%) |
Mkt cap ! $1.007B |
Open | High | Low | Value | Volume |
$4.70 | $4.81 | $4.56 | $4.771M | 1.031M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10845 | $4.62 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.63 | 6334 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 4657 | 4.600 |
4 | 1110 | 4.560 |
5 | 3890 | 4.550 |
1 | 3100 | 4.540 |
3 | 4200 | 4.520 |
Price($) | Vol. | No. |
---|---|---|
4.650 | 1887 | 1 |
4.700 | 220 | 1 |
4.740 | 210 | 1 |
4.750 | 2667 | 2 |
4.770 | 4000 | 1 |
Last trade - 16.10pm 31/01/2025 (20 minute delay) ? |
Featured News
VUL (ASX) Chart |