This feasibility study details a realistic path to initial production, as a precurser to larger stage 2 production once global demand warrants it. To those that state we'll never go into production, the feasibility encompasses costs for infrastructure at the bunyu north site and the site access road, and open to the possiblity of downstream processing options later. In terms of announcements coming up, I'm not expecting bond funding to come through until all other approvals and offtakes are signed. I'm confident approvals will come through along with offtakes and we'll be in small scale production without falling on our legs like battery minerals did and without endless dilution/farm-ins and excessive debt
- Forums
- ASX - By Stock
- Ann: Positive Stage 1 Feasibility Study Bunyu Graphite Project
This feasibility study details a realistic path to initial...
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VRC (ASX) to my watchlist
|
|||||
Last
0.5¢ |
Change
0.001(11.1%) |
Mkt cap ! $20.79M |
Open | High | Low | Value | Volume |
0.5¢ | 0.5¢ | 0.5¢ | $10.35K | 2.22M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
46 | 30991123 | 0.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 3564992 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
46 | 30991123 | 0.004 |
14 | 14907049 | 0.003 |
13 | 20491525 | 0.002 |
10 | 28167000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 3564992 | 6 |
0.006 | 20391205 | 30 |
0.007 | 7692551 | 8 |
0.008 | 5295275 | 10 |
0.009 | 5671149 | 8 |
Last trade - 10.27am 03/07/2024 (20 minute delay) ? |
Featured News
VRC (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO & MD
Anthony Noble
CEO & MD
Previous Video
Next Video
SPONSORED BY The Market Online