GTR 12.5% 0.4¢ gti energy ltd

Ann: Positive Start to Wyoming Uranium Drilling, page-7

  1. 85 Posts.
    lightbulb Created with Sketch. 7

    The initial 10 drill holes at the Thor Project were completed for a total of 5,019 feet (1,530 metres) within
    Exp area 1 (Figures 1 & 4). Typical economically viable ISR grade and GT cut‐offs are: 0.02% (200ppm)
    U3O8 and 0.2GT ‐‐ i.e., 10 ft (3 m) @ .02% (200ppm) U3O8. The 10 initial hole results were (Table 1):
    5 of 10 holes met both grade and GT cutoff with an average of 0.99GT
     Of the remaining 5 holes 3 met grade cutoff but not GT, 1 had trace mineralisation & 1 was barren
 
watchlist Created with Sketch. Add GTR (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
-0.001(12.5%)
Mkt cap ! $8.924M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $7.524K 2.142M

Buyers (Bids)

No. Vol. Price($)
61 42240137 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 6934875 12
View Market Depth
Last trade - 12.03pm 07/08/2024 (20 minute delay) ?
GTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.