Am impressed by the very through and low cost approach that AM7 employs on development of its Namibian battery metal projects. The current Lithium claypan JORC resource at Bitterwasser is at a very early stage of its growth path. Auger drilling to depths of around 10 meters on the mineralized claypans is very low cost. IMHO the next JORC up date will put LCE resources at around 500,000 metric tonnes(from two claypans), with JORC upgrade due in the June quarter. So we can guesstimate that JORC should exceed / approach 1.0MT over the balance of calendar 2023, as the third and fourth?? claypans are drilled out. This does not take into account the exploratory drilling that is imminent on the brines below the claypans (already underway?). IMHO this has global scale potential.
- Forums
- ASX - By Stock
- Ann: Positive test work indicates clean & low cost extraction
Am impressed by the very through and low cost approach that AM7...
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AM7 (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.960M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AM7 (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online