TGM 0.00% 13.0¢ theta gold mines limited

PowerPoint PresentationPlant Upgrade: Preliminary cost estimate...

  1. 2,626 Posts.
    lightbulb Created with Sketch. 26
    PowerPoint Presentation
    • Plant Upgrade: Preliminary cost estimate of US$11m (±30%). Cost is less than 50% ofthe construction of a new 500ktpa CIL processing plant

 
watchlist Created with Sketch. Add TGM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.